ROAD CONSTRUCTION
|
CONSTRUCTION OF LOTTE HIGHWAY |
|
![]() |
|
| Technical Deta |
|
Construction of Lo Te-Rach Soi Expressway, package: CW1: Km02+104.11 - Km26+275.00
Amount: Over USD 400 thousand Term: 2019 Location: Vinh Thanh District, Can Tho City Received the subcontract package under the Lotte-Halla-Hanshin joint venture. |
ROAD AND BRIDGE CONSTRUCTION
INFRASTRUCTURE
|
CONSTRUCTION OF STEEL OVERPASS Binh Thanh District Ho Chi Minh City |
|
![]() |
|
|
Technical Deta |
|
Bridge with the length of L=363,4m, the width of B= 16m. D500 steel-enforced concrete tube pile foundation, 30Mpa steel-enforced concrete support, steel box girder, steel-enforced concrete bridge deck structure carpet underlay with the thickness of 7cm. with the thickness of 20 cm, bridge deck Carriage way with the length of L=380,1m, the width of B= 16 m, steel-enforced concrete pile foundation structure, barrier. K98 made ground, K98 grade aggregate layer, and resin concrete layer with the thickness of 5cm. |
ROAD AND BRIDGE CONSTRUCTION
INFRASTRUCTURE
|
CONSTRUCTION OF STEEL OVERPASS Thu Duc District Ho Chi Minh City |
|
![]() |
|
|
Technical Deta |
|
Project scale: |
ROAD AND BRIDGE CONSTRUCTION
INFRASTRUCTURE
|
CONSTRUCTION OF STEEL OVERPASS BRIDGE District 6, Ho Chi Minh City |
|
![]() |
|
|
Technical Deta |
|
• Size: Bridge with the length of L=350m, the width of B= 12m. D1200m bored pile foundation, 30Mpa steel-enforced concrete support, steel box girder, steel-enforced concrete bridge deck structure with the thickness of 20 cm, bridge deck carpet underlay with the thickness of 7cm.
Approach road: Bored pile structure, steel-enforced concrete bulkhead, grade aggregate layer, resin layer with the thickness of 7cm. • Scope of Work: Construction of foundation, platform, pier shaft, bridge deck and finishing.
|
ROAD AND BRIDGE CONSTRUCTION
INFRASTRUCTURE
|
CONSTRUCTION OF RACH CHIEC BRIDGE Thu Duc and District 2, Ho Chi Minh City |
|
![]() |
|
|
Technical Deta |
|
Rach Chiec Bridge Construction on the Hanoi Highway. Project value over USD50 million. Balanced Cantilever construction. |